Previous Projects

  • Sutton Creek Fish Passage Project: Replaced failing culvert with a bridge.
  • Killam & Mill Creek Enhancement: 33 large wood structures placed, 10 acres of riparian planting.
  • Skookum Dam Breach: Simulated natural channel reconstruction.
  • Tomlinson Creek Fish Passage: Dual culverts replaced with a bridge.
  • Riparian Restoration: Multiple planting projects across Nehalem, Trask, and Tillamook Rivers.


Images: (Figures are from the SAP)

  • Killam Creek Large Wood Project (Figure 2)
  • Tomlinson Creek Fish Passage (Figure 3)
  • Tillamook Bay Basin Watersheds Map (Figure 1)
  • Estuarine Habitats of Tillamook Bay (Figure 4)
  • Salmon Distribution in the Tillamook Bay Basin (Figure 9)
  • Steelhead and Cutthroat Distribution (Figure 10)
  • Pacific Lamprey Distribution (Figure 11)
  • Historic Fires in the Tillamook Bay Basin (Figure 7)
  • Estuarine Restoration Priorities Map (Figure 15)